Folks Suite · Project Management Edition · v5.0

Estimate. Schedule.
Deliver without surprises.

FolksPMS runs an entire project on one SQL-Server-backed engine — a continuous Estimation → Budgeting → Scheduling → Kick-Off → Actuals spine, watched by a Deviation Engine that turns variance into governed change automatically. This hub is your complete User Manual and a hands-on Training Workbook in one place.

34
Modules
110
Tables
369
Pages documented
6
Gantt levels

The estimate-to-actuals spine

6 levels
  • Estimation (EG) — rough-order sizing that seeds the budget.
  • Budgeting (BG) — the cost baseline in money.
  • Scheduling (SG) — dated tasks, dependencies, critical path.
  • Kick-Off (KG) — the frozen, immutable baseline.
  • Actuals (AG) — what really happened, overlaid on plan.
  • Deviation (DV) — auto-raises Change Requests on breach.
The signature continuum

One task shape. Six levels of truth.

Every Gantt level shares the same underlying task, so any level can be overlaid on another. Plan flows left-to-right; the moment Actuals drift from the frozen Kick-Off baseline, the Deviation Engine acts.

EG · L1
Estimation

Rough-order sizing to win the mandate. Seeds the budget.

BG · L2
Budgeting

Estimate becomes money — the cost baseline.

SG · L3
Scheduling

Real dates, dependencies and the critical path.

KG · L4
Kick-Off

The schedule is frozen — the immutable baseline.

AG · L5
Actuals

What really happened, overlaid on the baseline.

DV · L6
Deviation

Breaches auto-promote into Change Requests.

When variance between Actuals and the frozen baseline breaches its threshold, FolksPMS does not just colour a cell red — it automatically raises a governed Change Request, closing the loop between execution and governance with no manual hand-off.

Two documents · one experience

Read the manual. Then earn the muscle memory.

Browse the reference when you need an answer, or follow the workbook to build hands-on competence across the whole estimate-to-actuals lifecycle.

Reference

User Manual

The complete reference for FolksPMS — a 10-part manual covering all 34 modules across 8 pillars, the six-level Gantt continuum, the Deviation Engine, the SQL-first data model, bilingual EN/AR, a status reference, troubleshooting and a glossary. Illustrated with real application screenshots and UI schematics.

40+ chapters 34 modules Live screenshots
Open the manual
Hands-on

Exercise Workbook

18 progressive labs and a final assessment, all built around one running case study — the Riverside Office Fit-Out. Take it from client setup and estimate, through budget, schedule and the kick-off baseline, into delivery, actuals, a real deviation and the Change Request it auto-raises — the full FolksPMS loop.

18 labs 14–18 hrs Final assessment + key
Start training

Built for delivery teams that hate surprises

The platform's core principles — and what you'll see threaded through every page of these docs.

SQL-first core

Every read and write runs through a named stored procedure — generic CRUD SP_s plus rich DevSP_ workflow procs. No ORM, no LINQ in business logic.

Six-level Gantt

Estimation → Budgeting → Scheduling → Kick-Off → Actuals on one shared task shape, overlayable level-against-level.

Deviation Engine

Continuously compares Actuals to the frozen baseline and auto-promotes threshold breaches into governed Change Requests.

RBAC by design

Menus, pages and actions gated by role privileges. You see exactly what your role grants — nothing more.

.NET 9 Blazor UI

Server-side Blazor with SignalR — live KPI dashboards, interactive Gantts and a modern indigo/cyan theme.

Bilingual EN / العربية

Full English and Saudi Arabic with right-to-left layout, switchable from the top bar in a click.

Governance gates

Change requests, approvals, escalations, compliance and an immutable audit trail across every module.

Supply & partners

Procurement with 3-way match and sub-contractor packages tied straight to the schedule and budget.

The whole map

Eight pillars · 34 modules

The navigation is organised into eight pillars. Click any module to jump straight to its chapter in the manual.

Workspace

Your daily cockpit — the Command Center dashboard, project & programme registers, and the planning board where work is shaped before it is scheduled.

Multi-Level Gantt

The six-level planning continuum: Estimation → Budgeting → Scheduling → Kick-Off (frozen baseline) → Actuals, with the Deviation Engine watching the gaps.

Delivery

Execution modules — tasks, resources, time & attendance, materials, quality and goals — where the plan turns into delivered work.

Governance

Control gates: change requests, approvals, escalations, compliance and audit. Nothing material moves without a recorded decision.

Service & Collab

Documents, calendar sync, notifications, training and a ticket/helpdesk desk — the connective tissue that keeps the team aligned.

Supply

Buy / sell procurement and sub-contractor management — bringing external goods, services and partners into the project safely.

Reports & Insight

Cross-module reporting and the Insights analytics surface that turns the warehouse of project data into decisions.

Administration

Platform foundations — user management & RBAC, organisation structure, system parameters and the client master.
Straight from the application

See it before you sign in

These are real FolksPMS screens, captured live. Click any to enlarge — every one is documented page-by-page in the manual.

folkspms /login
FolksPMS login screen
Sign-in & RBACJWT login, role resolution, default landing.
folkspms /home
Command Center dashboard
Command CenterLive KPI rollups across all eight pillars.
folkspms /w/PR
Projects register
Project RegisterThe spine entity, with derived health buckets.
folkspms /w/KG
Kick-Off Gantt
Kick-Off GanttThe frozen baseline every actual is judged against.
folkspms /w/TK
Task board
TasksThe atomic unit of delivery, with dependencies.
folkspms /w/CH
Change requests
Change RequestsWhere the Deviation Engine drops auto-raised CRs.
8
Navigation pillars
40+
Manual chapters
18
Hands-on labs
2
Languages · EN / AR
Jump straight in

Popular destinations

Shortcuts to the pages and labs people open most.

Login, roles & common operationsManual · Part I — Foundations The estimate-to-actuals spineManual · Part I — the whole continuum Projects — the spine of the suiteManual · Part II — Workspace Deviation Engine → Change RequestsManual · Part III — the showcase module Lab 1 — OrientationWorkbook · 30 min · Foundation Lab 18 — Estimate-to-actuals capstoneWorkbook · 90 min · Advanced

Ready to learn FolksPMS end-to-end?

Start with the manual for the concepts, then run the Riverside Office Fit-Out case study in the workbook to make it stick. Both are self-paced and fully printable.